Special forces to use lessons learned from Ukraine to buy new amphibious warships

Special forces to use lessons learned from Ukraine to buy new amphibious warships


Construction of further amphibious warships is underway, but HMS Albion will reach the end of its planned service life (Photo: Royal Navy)
Construction of further amphibious warships is underway, but HMS Albion will reach the end of its planned service life (Photo: Royal Navy)

Up to six new amphibious warships for the Royal Marines will be built, drawing on lessons learned from the Ukraine war and Houthi attacks on Red Sea shipping.

Defense Secretary Grant Shapps said the first three ships would definitely be built for the Royal Marines, with the remaining three on the way.

These ships, known as Multi-Role Support Ships (MRSS), are specialized warships designed to rapidly deploy commando forces to coastlines around the world to conduct special operations.

Speaking at the annual Seapower Conference in central London, the Defense Secretary also announced that the existing amphibious ships Albion and Bulwark will not be dismantled or stored before their scheduled retirement dates in 2033-2034. .

He told Force News: “I’m very confident about the crossover time.”

“Especially because for the foreseeable future we intend to maintain the existing fleet for the Royal Marines,” he said.

Drones are becoming increasingly important to the Royal Navy, with new ships to be equipped with a range of UAVs (Photo: Royal Navy)
Unmanned aerial vehicles are becoming increasingly important to the Royal Navy, with new ships to be equipped with a range of unmanned aerial vehicles (Photo: Royal Navy)

“But the good thing about the multi-role design, as was the case with the Type-26, is that the design is designed to be more modular and can be used in a variety of use cases.”

Furthermore, First Sea Lord Admiral Ben Key said that if the UK was able to “move quickly and confidently into disputed waters” and was “ready to do so” it would send a “deterrence message” to potential adversaries. ” will be part of the

“That requires all the unique skillsets found in Royal Marines Commando today and as they are building for the future as part of their transformation,” he said.

“But it also requires a way to get them to work, pick them up when they’re done, and take them to the next job.”

Mr Shapps said the three MRSS vessels identified were among 28 warships and submarines planned or currently under construction.

He said: “This is a new golden age for British shipbuilding.

“The Royal Marines’ new ships will help our brave special forces fight future conflicts.

Ships like the new MRSS and HMS Bulwark are needed to land commandos where they need to be (Photo: MOD)
Ships like the new MRSS and HMS Bulwark are needed to land commandos where they need to be (Photo: MOD)

“All this is possible because this government has committed to spending 2.5% of GDP on defense by the end of this decade as part of our plan to provide you and your families with a more secure future.”

Russia’s Black Sea Fleet has proven vulnerable to attacks from Ukrainian missiles and drones.

And in the Red Sea, Yemen’s Iranian-backed Houthis are using weapons to target commercial ships and international warships guarding vital trade routes.

In response, MRSS ships are designed to transport a wide range of unmanned drones, along with vehicles, aircraft, and insertion aircraft.

It can also function as a primary casualty reception vessel and provide emergency medical care.

Under the plan, the Type 26 and Type 31 frigates will be built in Scotland, the Astute and Dreadnought submarines will be built at Barrow-in-Furness, and the Fleet Solid Support Ships will be built in Belfast and Devon.

In total, up to six MRSSs will be built in line with the National Shipbuilding Strategy, to replace current capacity in the early 2030s.

This includes two landing platform docks, three landing ship docks (auxiliary vessels), and the air support ship RFA Argus.

Join our newsletter



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *